Executive Summary

Wagners CFT delivered several FRP solutions providing clear and safe access to the world renowned beaches of Stradbroke Island for Redland City Council. These FRP solutions included boardwalks, Frenchman beach stairs and a viewing platform. With a focus on durability and minimal maintenance, the chosen Wagners CFT materials provided an aesthetically pleasing solution backed by their proven performance and non-corrosive properties. Throughout the project, Roman Contractors worked closely with Wagners CFT, collaborating with the Council's design engineers to ensure environmental considerations were addressed, site safety was prioritised, and cost-efficiency was maintained. The project successfully overcame challenges through diligent monitoring of material supply, labour, costs, and quality control processes while delivering a high-quality outcome.

"Working with Wagners CFT on the Stradbroke Island beach access project, we experienced exceptional collaboration, outstanding material performance, and great attention to detail."

- Filippo Di Guglielmo, Director, Roman Contractors

The Project

Roman Contracts needed to develop a low-maintenance pedestrian structure with a minimum lifespan of 50 years.

Read more about the project below:

  • Key Challenges

    • Overcoming environmental impacts and designing a cost-efficient solution within the asset owner's budget.
    • Ensuring compliance with regulatory bodies and managing third-party contractors.
    • Addressing site safety challenges and maintaining high quality throughout the project.
  • Selection of Wagners CFT

    • Unlike traditional building materials like steel, the non-corrosive nature of Wagners CFT materials was a critical factor in the decision-making process, ensuring long-term performance and resistance to environmental elements. 
    • The easy-to-maintain and aesthetically pleasing nature of the Wagners CFT structures was also a contributing factor. 
  • Wagners CFT’s Solution

    • Conducted multiple site visits to assess the project requirements and environmental considerations.
    • Provided accurate material take-offs and closely monitored labour and material costs.
    • Assessed risks and develop contingency plans to mitigate potential issues.
    • Implemented thorough reviews of portionable sections during the manufacturing process to maintain quality standards before dispatching the materials.