Executive Summary

The partnership between Wagners CFT and Contour Works resulted in the successful delivery of a new boardwalk located in the heart of Australia’s iconic Crater Lake National Park, addressing the challenges faced by the existing trail that did not comply with AS standards and lacked DDA accessibility. The project's goals included identifying optimal materials, reducing ongoing maintenance, and incorporating a collaboration of Wagners CFT FRP, timber, and steel.

"Wagners CFT’s ability to provide an innovative and sustainable solution that utilised various materials was instrumental in the success of this project. Their professionalism, responsiveness and ability to work within tight timelines made them a valuable partner."

- Evan Winton, Director, Contour Works

The Project

Contour Works needed to implement a sustainable solution that would significantly extend the lifespan of the boardwalk and reach a AS & DDA compliant standard.

Read more about the project below:

  • Key Challenges

    Conceptually designing the project to meet the end client's FRP, timber, and steel aesthetics needs.

  • Selection of Wagners CFT

    • Wagners CFT was chosen based on their ability to design and engineer with multiple material choices.
    • Additionally, Wagners CFT solutions met the client's requirements for durability, sustainability, and compliance.
  • Wagners CFT’s Solution

    Wagners CFT addressed these challenges by engaging early with the principal contractor, landscape architect, and certifying the engineering firm representing the asset owner; resulting in a successful project that minimally impacted the environment and achieved the desired aesthetic outcomes.