Environmental Noise Control Panels

Environmental Noise Control Panels

Executive Summary

Environmental Noise Control (ENC) required internal framing for a large set of distribution facilities to support their noise curtains. However, welding steel inside the facility was not feasible, and the installation needed to be carried out during operation, posing challenges in material handling. Wagners CFT successfully designed, manufactured, and delivered the frame system project two weeks ahead of schedule.

This system had to be lightweight, easy to install, troubleshoot in the field, and offer a clean finish. Wagners CFT's design expertise ensured that the proposed solution met both the aesthetic requirements and the practical use case. Notably, the frame system incorporated 5"x5" pultrusion with steel bracketing, offering a lightweight alternative that weighed only 15% of steel.

"Wagners CFT proved to be the ideal partner for this project, offering a comprehensive turnkey solution that encompassed design, supply, and on-site support. Their commitment to providing a cost-effective solution, both in terms of material and installation, was key in delivering this project."

- Environmental Noise Control

The Project

The primary goal was to replace the deteriorated poles with a sustainable and durable long-term solution, reducing the ongoing maintenance required once the new light poles were installed.

Read more about the project below:

  • Key Challenges

    The project faced the challenge of ensuring the structural design's longevity, considering the regular forklift traffic within the facilities. The solution needed to withstand the demanding environment without compromising safety.

  • Selection of Wagners CFT

    ENC chose to collaborate with Wagners CFT due to their turnkey solution, which included design, supply, and on-site support. By opting for a comprehensive package, ENC minimized risks and gained confidence in the project's success. Wagners CFT's product also offered cost-effectiveness, considering the installation efficiencies gained from the lightweight nature and pre-fabrication.

  • Wagners CFT’s Solution

    To address the challenge of structural longevity, Wagners CFT partnered with ENC to design a connection solution that would support the framing system while withstanding the regular forklift traffic. This collaborative effort ensured the durability and reliability of the structure.

    The installation of the frame system on the first of four projects resulted in significant time savings. ENC successfully completed the installation two weeks ahead of schedule, showcasing the efficiency and effectiveness of the solution provided by Wagners CFT. The lightweight nature of the frame system, combined with its simplified installation process, contributed to this early completion.